Key facts
- Whole-home flooring, kitchens, baths, stairs and trim
- Phased remodels to fit your budget
- Licensed trades coordinated for plumbing and electrical
- One point of contact from consultation to walkthrough

Juggling five contractors who do not talk to each other is nobody's idea of fun. Paradise Spaces brings your remodel under one roof. We sequence flooring, tile, stairs, trim and finishes in the right order, coordinate licensed trades, and keep you updated every week, so you can enjoy the transformation instead of managing it.
Common remodeling projects
- Whole-home flooring replacement with matching stairs
- Kitchen updates with new cabinets, countertops and backsplash
- Bathroom renovations and tub-to-shower conversions
- Opening walls between kitchen and living areas, after structural review
- Attic conversions that add living space
- Trim, baseboard and door updates throughout the home
- Restoration rebuilds after water or storm damage
Why one team works better
Order matters. Paint before flooring, flooring before baseboards, tile before vanities: when one company owns the schedule, trades are not undoing each other's work. Combining projects such as floors and stairs, or a kitchen and new floors, usually saves time and produces a more consistent finish.
Budgeting and phasing
Not everything has to happen at once. We can phase your remodel, starting with the rooms that matter most, while planning later phases so colors and materials stay consistent. Read how to budget for a remodel.
Finishes that flow
We help you coordinate flooring color, trim style, paint, tile and hardware so the whole home feels connected. Bringing samples into your actual light before you decide avoids surprises.
Older homes
Homes built before 1978 may contain lead paint, and some older floor tile and mastic can contain asbestos. We test or plan around these materials and follow safe work practices. Read asbestos in old floor tile.
Communication you can count on
A clear scope, a schedule and one point of contact. If we find something unexpected behind a wall or under a floor, we show you and discuss options before moving forward.
What drives the price
Scope, the number of rooms, layout changes, structural work, plumbing and electrical, material selections and the phasing plan all affect cost. A detailed scope at the start keeps your budget predictable, and we flag allowances clearly so there are no surprises.
Serving DFW neighborhoods
We remodel homes across Dallas Fort Worth, including Dallas, Coppell, Plano, Frisco, Irving, Carrollton and surrounding cities. See our service areas.
Our remodeling process
- Consultation: we walk the home with you, listen to goals and discuss budget ranges.
- Scope and proposal: an itemized plan with selections, allowances and schedule.
- Preparation: protection of floors and furniture, dust control and demolition.
- Build: trades sequenced in the right order, with weekly updates.
- Finish: trim, paint touch-ups, clean-up and a final walkthrough with you.
Frequently Asked Questions
Can you remodel several rooms at once?
Yes. We sequence the work so rooms are finished efficiently and you keep as much of your home usable as possible.
Do you pull permits?
When the scope requires permits, they are obtained for the work as required by your city.
Can I phase my remodel?
Yes. We plan phases so materials and colors stay consistent across the home.
Do you handle structural changes?
Wall removals and structural changes are reviewed by qualified professionals before work begins.
Do you work in older homes?
Yes. We plan for older-home conditions, including possible lead paint or asbestos-containing materials.
How do I start?
Book a free consultation. We visit, listen, measure and provide an itemized proposal.



