Key facts
- Primary baths, guest baths and powder rooms
- Tub-to-shower conversions and curbless showers
- Continuous waterproofing and sloped shower bases
- Typical timeline: 2 to 4 weeks

A great bathroom changes your whole day. Picture a roomy walk-in shower, warm light, a double vanity with space for everything and tile you love looking at. Paradise Spaces remodels bathrooms across Dallas Fort Worth and Coppell, and we build them the way the pros do: waterproofing first, beautiful finishes second.
Popular bathroom upgrades
- Tub-to-shower conversions: trade an unused garden tub for a spacious walk-in shower
- Curbless and low-curb showers: sleek, accessible and easy to clean
- Tile: porcelain floors, shower walls, niches and mosaic shower pans
- Vanities: double vanities with quartz tops and undermount sinks
- Glass: frameless and semi-frameless shower enclosures
- Floors: porcelain tile or waterproof luxury vinyl
Read waterproof flooring for bathrooms: tile vs luxury vinyl.
Waterproofing: the part you never see
Showers fail when water gets behind the tile. Every shower we build has a continuous waterproofing system: a properly sloped base, a bonded membrane or foam board system on walls and floor, sealed seams, corners and penetrations, and the correct drain assembly. That is how a tiled shower stays leak-free for decades. Read shower waterproofing systems.
Safer, smarter bathrooms
Planning for the years ahead costs little during a remodel: curbless entries, blocking in walls for future grab bars, comfort-height toilets, handheld shower heads, slip-resistant floor tile and wider doorways.
Ventilation and lighting
A properly sized exhaust fan protects new finishes from moisture and mildew. Layered lighting, including vanity, ceiling and shower lights, makes daily routines easier and shows off your tile.
Timeline
Most bathroom remodels take 2 to 4 weeks, depending on scope, plumbing changes and material lead times. We confirm every selection before demolition so the work moves steadily.
What drives the price
Size, layout changes, shower type and size, tile choices, glass enclosures, vanity and countertop, fixtures, lighting and ventilation all affect cost. Keeping plumbing in place controls costs; converting a tub to a large walk-in shower is one of the best-value transformations.
Materials that last
We recommend porcelain tile, quartz vanity tops, quality fixtures and sealed or stain-resistant grout for low maintenance. Durable materials keep a bathroom looking new long after the remodel is finished.
Guest baths and powder rooms
Guest baths benefit from durable, easy-clean finishes and a tub-to-shower conversion or a fresh tile surround. Powder rooms are perfect for bold tile, statement lighting and a striking vanity, since they get light use and big visual impact.
Our bathroom remodel process
- Free consultation, measurements and design selections
- Itemized proposal and schedule
- Protection of adjoining rooms and demolition
- Plumbing and electrical rough-in by licensed trades
- Shower base, waterproofing and flood testing where applicable
- Tile, vanity, fixtures, glass and lighting
- Final walkthrough and care instructions
Frequently Asked Questions
How long does a bathroom remodel take?
Most take 2 to 4 weeks. Primary bathrooms with layout changes can take longer.
Can you convert my tub to a walk-in shower?
Yes. We remove the tub, build a sloped and waterproofed shower base, tile the walls and floor and install glass.
What is the best bathroom flooring?
Porcelain tile is the classic, fully waterproof choice. Waterproof luxury vinyl is warmer and softer underfoot.
Do you handle plumbing changes?
Yes, with licensed plumbers coordinated as part of your project.
Can a bathroom be made accessible?
Yes. Curbless showers, grab bar blocking, comfort-height fixtures and slip-resistant tile are all options.
How do you prevent shower leaks?
With a continuous waterproofing system, correct slope to the drain and sealed penetrations, installed to manufacturer instructions.



